What to specify
List the project requirements and evidence needed for supplier review.
- Required acceptance test protocol (Routine End-of-Line Electrical Test vs. Full Dynamometer Type Test with Heat-Run)
- Reference heatsink plate dimensions, ambient temperature, and DC/AC bus voltage to specify for load testing
- Specific test curves required (T-N, T-I, Efficiency Map, Cogging Trace, Back-EMF FFT, Thermal Rth)
- Serialization, inspection report format (PDF / CSV), and FAI / PPAP documentation requirements
